Collective Bargaining round in Austrian Metalworking and Mining Industry

EMF
GMTN
15/10/2009

Report on the first bargaining round in the Austrian metalworking and mining industry sector

only for your network

eZ debug

Clear cache:

Quick settings:

Timing: Feb 11 2012 00:34:19
Module start 'content'
Timing: Feb 11 2012 00:34:19
Module end 'content'
Timing: Feb 11 2012 00:34:19
End

Timing points:

CheckpointElapsedRel. ElapsedMemoryRel. Memory
Module start 'content'0.0000 sec0.0735 sec4,336.6719KB2,198.3242KB
Module end 'content'0.0735 sec0.0131 sec6,534.9961KB1,801.4492KB
End0.0866 sec 8,336.4453KB0.0000KB
Total runtime:0.0951 sec

Time accumulators:

 Accumulator Elapsed Percent Count Average
ini_load
Load cache0.0130 sec8.4189%110.0012 sec
FindInputFiles0.0100 sec6.4291%110.0009 sec
Mysql Total
Mysqli_queries0.0014 sec0.8934%30.0005 sec
Looping result0.0001 sec0.0385%30.0000 sec
Template Total0.0188 sec 12.1% 2 0.0094 sec
Template load0.0076 sec4.9371%20.0038 sec
Template processing0.0110 sec7.1106%20.0055 sec
override
Cache load0.0039 sec2.5049%20.0019 sec
General
String conversion0.0000 sec0.0052%10.0000 sec
dbfile0.0492 sec31.7899%40.0123 sec
Total script time:0.1548 sec

Templates used to render the page:

Usage countRequested templateTemplateTemplate loadedEditOverride
1pagelayout.tpl<No override>design/eucoban/templates/pagelayout.tplEdit templateOverride template
1setup/debug_toolbar.tpl<No override>design/sydesy/templates/setup/debug_toolbar.tplEdit templateOverride template
      
 Number of times templates used: 2
 Number of unique templates used: 2
 Time used to render template usage: 0.0001 secs