Germany: No result so far from collective bargaining in North-Rhine Westphalia

EMF
IG Metall
12/02/2010

The first bargaining round in North Rhine-Westphalia was adjourned in the night of 10th February without any result.

public report

eZ debug

Clear cache:

Quick settings:

Timing: May 22 2012 15:44:35
Module start 'content'
Timing: May 22 2012 15:44:35
Module end 'content'
Timing: May 22 2012 15:44:35
End

Timing points:

CheckpointElapsedRel. ElapsedMemoryRel. Memory
Module start 'content'0.0000 sec0.2113 sec4,338.2383KB2,198.2773KB
Module end 'content'0.2113 sec0.0344 sec6,536.5156KB1,801.3750KB
End0.2457 sec 8,337.8906KB0.0000KB
Total runtime:0.2685 sec

Time accumulators:

 Accumulator Elapsed Percent Count Average
ini_load
Load cache0.0261 sec7.4702%110.0024 sec
FindInputFiles0.0202 sec5.7804%110.0018 sec
Mysql Total
Mysqli_queries0.0026 sec0.7571%30.0009 sec
Looping result0.0001 sec0.0280%30.0000 sec
Template Total0.0500 sec 14.3% 2 0.0250 sec
Template load0.0204 sec5.8291%20.0102 sec
Template processing0.0294 sec8.4138%20.0147 sec
override
Cache load0.0107 sec3.0699%20.0054 sec
General
String conversion0.0000 sec0.0055%10.0000 sec
dbfile0.0484 sec13.8438%40.0121 sec
Total script time:0.3496 sec

Templates used to render the page:

Usage countRequested templateTemplateTemplate loadedEditOverride
1pagelayout.tpl<No override>design/eucoban/templates/pagelayout.tplEdit templateOverride template
1setup/debug_toolbar.tpl<No override>design/sydesy/templates/setup/debug_toolbar.tplEdit templateOverride template
      
 Number of times templates used: 2
 Number of unique templates used: 2
 Time used to render template usage: 0.0002 secs